Reimagining Military Hardware Through Play
When Arcadia Spectacular commissioned Cre8it to deliver the HELISWING installation for Valley Fest 2023, the brief was unlike anything we'd tackled before.
The challenge was to transform a genuine piece of military hardware into an exciting, welcoming play experience that encouraged curiosity rather than conflict. The result was HELISWING — a large-scale interactive timber swing structure centred around the helicopter, allowing families and children to engage with the aircraft in a completely new and positive way.
More than simply constructing a swing, this project was about changing perception. By surrounding the helicopter with natural materials and playful design, the installation became a place of laughter, imagination and exploration instead of intimidation.
Designed, engineered and built by Cre8it, the project demonstrated our ability to combine creative thinking with practical problem solving under demanding festival conditions.
The Challenge
HELISWING wasn't a workshop build. Every aspect had to be planned so it could be transported to site, assembled in an open field and completed within an incredibly tight installation window of less than one week.
Working against the clock, our team coordinated logistics, materials and construction to ensure the attraction was completed safely, on schedule and ready to welcome thousands of visitors.
The Result
HELISWING quickly became one of Valley Fest's favourite family attractions, with children spending hours climbing aboard, swinging and interacting with the installation.
Projects like this perfectly demonstrate what Cre8it does best — taking ambitious ideas and turning them into memorable real-world experiences. Whether it's a festival installation, immersive set, interactive attraction or large-scale public artwork, we thrive on solving complex creative challenges and delivering projects that people genuinely remember.
Key Project Considerations
- Complete design and build of the interactive swing installation.
- Transforming military hardware into a family-friendly experience.
- Designing the timber structure around the helicopter as the central feature.
- Structural design to safely support multiple users throughout the event.
- Careful material sourcing for strength, durability and visual impact.
- Rapid off-site preparation to minimise on-site build time.
- Full on-site construction within a live festival environment.
- Groundworks and accurate positioning before construction commenced.
- Safe integration with the helicopter without compromising its integrity.
- Efficient transport, handling and installation of large timber components.
- Tight programme delivery with completion in under one week.
- Designing for high visitor throughput while maintaining safety and reliability.
- Working alongside other contractors within a busy festival build schedule.
- Delivering a robust installation capable of withstanding continuous public use.